- HOME
- ABOUT US
- SERVICES
-
LICENCE & CERTIFICATION
- BIS (ISI MARK) FOR FOREIGN MANUFACTURERS
- DOMESTIC PRODUCT CERTIFICATION (ISI MARK)
- BIS SCHEME X CERTIFICATION
- BIS CERTIFICATE OF CONFORMITY (CoC)
- BIS HALLMARKING
- REACH CERTIFICATION (GLOBAL)
- LABORATORY RECOGNITION SCHEME (LRS)
- WORLD MANUFACTURER IDENTIFIER (WMI) CODE
- ECO MARK
- TAC APPROVAL FOR AUTOMOBILE
- PESO CERTIFICATION
- SASO CERTIFICATION
- CDSCO CERTIFICATION
-
REGISTRATION
- BIS (CRS) REGISTRATION FOR ELECTRONIC PRODUCT
- WPC-ETA APPROVAL
- BEE CERTIFICATION
- E-WASTE MANAGEMENT (EPR)
- EPR REGISTRATION FOR PLASTIC WASTE MANAGEMENT
- EPR REGISTRATION FOR BATTERY WASTE MANAGEMENT
- EPR REGISTRATION FOR USED OIL
- LEGAL METROLOGY (LMPC)
- TEC/MTCTE APPROVAL
- CE CERTIFICATION
- UL CERTIFICATION
- ROHS LICENCE
- DRONE REGISTRATION
- MOEF LICENCE
-
AUXILIARY
- STANDARDIZATION (SCIENTIFIC) DIVISION
- TRAINING SERVICES (NATIONAL & INTERNATIONAL)
- IMPORT/EXPORT LICENCE
- FSSAI CERTIFICATION
- MSME/SSI/NSIC REGISTRATION
- ISO REGISTRATION
- BRAND REPRESENTATION
- LABORATORY EQUIPMENT AND SETUP
- TRADEMARK REGISTRATION
- MAKE IN INDIA SUPPORT
- AG-MARK LICENCE
- THIRD PARTY INSPECTION AND MONITORING SERVICES
-
- PORTFOLIO
- UPDATES
- CONTACT
- LOGIN
BIS Issues Guidelines for Implementation of IS 16102 (Part 1):2026 – Key Updates for Manufacturers
The Bureau of Indian Standards (BIS) has officially released guidelines for the implementation of the revised standard IS 16102 (Part 1):2026, replacing the earlier version IS 16102 (Part 1):2012.
This revision introduces important technical and compliance updates for LED lamp manufacturers and applicants under the BIS Registration Scheme.
If you are a manufacturer, importer, or brand owner dealing in LED lamps, this update directly impacts your certification roadmap.
Transition Timeline: Important Dates to Note
- Revised Standard Published: IS 16102 (Part 1):2026
- Last Date of Concurrent Running: 02 August 2026
- After 02 August 2026, the old standard IS 16102 (Part 1):2012 will be withdrawn.
Beyond this date, no licence will remain valid unless compliance with the revised 2026 standard is ensured.
Key Changes Introduced in IS 16102 (Part 1):2026
The revised standard includes several significant technical enhancements aimed at improving safety, performance, and product reliability.
Major Updates Include:
- Rated input power of lamps now covered up to 60W
- Introduction of photo biological safety test requirements
- Coverage extended to LED lamps with non-removable rechargeable batteries
- Addition of abnormal operating condition tests
- Inclusion of ingress protection (IP) test requirements
- New marking requirements for:
o Lamps not suitable for water contact
o Photo biological safety classification - Introduction of axial strength testing for Edison caps
- Modified test requirements for fault conditions
These changes strengthen product safety and bring Indian requirements closer to global safety benchmarks.
Guidelines for Existing BIS Licensees
Existing license holders must take immediate action to ensure continued compliance.
Mandatory Requirements:
- Implement IS 16102 (Part 1):2026 before 02 August 2026
- Submit complete test reports from a BIS-recognized laboratory for all lead models previously tested under the 2012 version
- Provide an undertaking confirming that all series models within the licence scope comply with the revised standard
Important Warning
Failure to complete implementation before the deadline may result in:
- Cancellation of licence
- Deletion of model(s) from the scope of licence
This makes timely action critical for business continuity.
Guidelines for New Applicants
BIS has provided transitional flexibility for new applicants:
- Applications with already submitted samples/test reports may be processed under the old standard.
- New applications may be processed under either the old or revised standard only until 02 August 2026.
- Applicants opting for the old standard must declare that they will implement the revised version before the deadline.
- After 02 August 2026, no licence will be granted under IS 16102 (Part 1):2012.
Change in Scope of Licence
For scope extensions:
- Provisions applicable to new applicants will apply.
- Processing under the old standard is permitted only until:
The licensee switches to the revised standard, OR
02 August 2026, whichever is earlier.
What This Means for LED Manufacturers
The revision emphasizes:
- Enhanced product safety
- Improved testing protocols
- Clearer marking requirements
- Expanded product coverage
Manufacturers should:
- Review technical documentation immediately
- Conduct gap analysis between 2012 and 2026 versions
- Schedule product testing with BIS-recognized laboratories
- Plan early transition to avoid last-minute compliance risks
Final Thoughts
The implementation guidelines for IS 16102 (Part 1):2026 are now in force with immediate effect. The transition window may seem sufficient, but considering laboratory timelines, documentation updates, and internal approvals, early action is strongly recommended.
Ensuring timely compliance will help manufacturers maintain uninterrupted market access and avoid regulatory complications.
For expert guidance on BIS registration, testing coordination, documentation, or transition strategy, professional guidance can significantly streamline the process feel free to connect with our team.


















